Final assembly work has begun on the first of two ACV-17R1 cement trucks in our new workshop.

While the hopper tank is in the paint shop, the working equipment—a filter, hydraulic power unit, and compressor unit—is being installed on the KAMAZ chassis. The hydraulic system, oil pumps, and motors are being assembled.

After painting the tank, all that remains is to mount it on the chassis.